Quick Revision

GK One-Line Question & Answer

15541+ short questions with short answers, covering every category and sub-category on the site — no long articles to scroll through. Good for a fast recap before an exam, or a few minutes of daily practice.

Software Engineering → Software Design 4

SQA stands for
Software development company
click to copy
ISO 9000 seeks standardization in terms of
independent test group
click to copy
A quality circle holds a brainstorming session and attempts to identify the factors responsible for flaws in a product. Which tool do you suggest they use to organize their findings?
Test data management technique
click to copy
Which of the following statements is NOT true?
ISO 9001:2000
click to copy

Software Engineering → Coding Standards 4

Quality costs may be divided into costs associated with
Customer’s site
click to copy
Total Quality Management emphasizes
Metrics
click to copy
When a sample measurement falls inside the control limits, it means that
Regression testing
click to copy
Formal Reviews seek to:
Define, measure, analyze
click to copy

Software Engineering → Software Testing 4

Variation control in the context of software engineering involves controlling variation in the
30-40%
click to copy
A successful TQM program incorporates all of the following except
All of the mentioned
click to copy
Which of the following is true regarding control charts?
80, 20
click to copy
Which form of software development model is most suited to a system where all the requirements are known at the start of a project and remain stable throughout the project?
The definition proposed by the American Society for Quality Control
click to copy

Software Engineering → Debugging 4

A key concept of quality control is that all work products
All of the above
click to copy
"Kaizen" is a Japanese term meaning
Nonexistent loop termination
click to copy
Which type of risk factor is most likely to cause problems for a software project developing commercial software?
5 related standards
click to copy
Which of the following are objectives for formal technical reviews?
Inadequate user documentation
click to copy

Software Engineering → Software Maintenance 4

Which of these activities is not one of the activities recommended to be performed by an independent SQA group?
Identification of faults
click to copy
The philosophy of zero defects is
Error description is unintelligible
click to copy
Defect prevention is defined as:
Conformance to user specified requirements.
click to copy
Regression testing is known as
Finding and fixing errors before release but after insertion
click to copy

Software Engineering → Introduction to Software Engineering 4

Software safety is a quality assurance activity that focuses on hazards that
Unit testing
click to copy
Quality Circles members are
Low-level components are combined into clusters that perform specific software sub-function.
click to copy
Product quality is defined as:
Software quality assurance
click to copy
At the end of a formal technical review all attendees can decide to
Delivering a product using high quality procedures
click to copy

Software Engineering → Software Development Models 4

The ISO quality assurance standard that applies to software engineering is
fixing the error
click to copy
The process of identifying other organizations that are best at some facet of your operations and then modeling your organization after them is known as
Fault-based testing
click to copy
Which of the following is NOT a main reason to undertake software quality assurance activities?
Prevention, appraisal and failure
click to copy
A review summary report answers which three questions?
Insistence by the user on a satisfactory software quality assurance programme
click to copy

Software Engineering → Waterfall Model 3

Which of the following is not a section in the standard for SQA plans recommended by IEEE?
Testing, Debugging
click to copy
A quality loss function utilizes all of the following costs except
Surface structure
click to copy
Which type of risk factor is most likely to cause problems for a software project which develops military software?
All of the above
click to copy

Software Engineering → Spiral Model 3

Six Sigma methodologies define three core steps.
Testing is part of a complete QA process
click to copy
Among the tools of TQM, the tool ordinarily used to aid in understanding the sequence of events through which a product travels is a
Category-based partitioning
click to copy
The main goal of quality assurance is:
Are thoroughly tested before delivery to the customer
click to copy

Software Engineering → Agile Model 3

"Quality is defined by the customer" is
Ranking items by importance
click to copy
A fishbone diagram is also known as a
PERT chart
click to copy
Software interoperability is:
Serve as the sole test team for any software produced
click to copy

Software Engineering → Requirement Engineering 3

Which of the following is not one of the major categories of costs associated with quality?
Different testing techniques are appropriate at different points in time.
click to copy
If a sample of parts is measured and the mean of the measurements is outside the control limits the process is
Black box testing
click to copy
With respect to software metrics, which statement is NOT true?
May cause an entire system to fail
click to copy