Software Engineering → Requirement Engineering 4

Handover of Test-ware is a part of which Phase
requirements gathering
click to copy
Retesting of a single program or component after a change has been made?
size
click to copy
Executing the same test case on a modified build called as
the analysis of program code.
click to copy
Integration, It will come under
usability testing
click to copy

Software Engineering → Software Design 4

The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. Identify the Equivalence values which belong to the same class.
black box testing
click to copy
The testing which is done by going thro' the code is known as,
a histogram
click to copy
Informing to the developer which bug to be fix first is called as
boo01k
click to copy
Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
all the above
click to copy

Software Engineering → Coding Standards 4

The approach/document used to make sure all the requirements are covered when writing test cases
test data management technique
click to copy
This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as
control chart
click to copy
Retesting modules connected to the program or component after a change has been made?
test analysis and design
click to copy
How severely the bug is effecting the application is called as
quality assurance
click to copy

Software Engineering → Software Testing 4

Executing the same test case by giving the number of inputs on same build called as
bar chart
click to copy
Phase Definition. It will come under
reliability
click to copy
An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under
test implementation and execution
click to copy
The name of the testing which is done to make sure the existing features are not affected by new changes
closed box testing
click to copy

Software Engineering → Debugging 4

To check whether we are developing the right product according to the customer requirements are not. It is a static process
80-20 rule
click to copy
Software testing which is done without planning and Documentation is known as
test manager
click to copy
SPICE Means
live data
click to copy
Management and Measurement, It will come under
pareto analysis
click to copy

Software Engineering → Software Maintenance 4

To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process.
acceptance
click to copy
Acceptance testing is known as
prevention
click to copy
Standards and procedures for managing changes in an evolving software product is called?
test closure activities
click to copy
AdHoc testing is a part of
unit regression
click to copy

Software Engineering → Introduction to Software Engineering 4

A Non-Functional Software testing done to check if the user interface is easy to use and understand
appraisal
click to copy
Retesting the entire application after a change has been made called as?
black box testing
click to copy
This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as
22,23,24
click to copy
------------- means under what test environment(Hardware, software set up. the application will run smoothly
white box testing
click to copy

Software Engineering → Software Development Models 3

What are the Testing Levels?
all modules need to be completed prior to testing
click to copy
Boundary value analysis belongs to which testing method?
iso
click to copy
This type of test include, how well the user will be able to understand and interact with the system?
traceability matrix
click to copy

Software Engineering → Waterfall Model 3

It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process.
mission
click to copy
It measures the quality of a product It is a specific part of the QA procedure, It is a corrective process, It applies for particular product & Deals with the product.
logging the outcome of test execution.
click to copy
Defects generally fall into the following categories?
retesting
click to copy

Software Engineering → Spiral Model 3

White box testing is not called as___________
cause and effect graphing
click to copy
What are the Types of Integration Testing?
load testing
click to copy
Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as
verification
click to copy

Software Engineering → Agile Model 3

Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as
software development process and software testing process
click to copy
Which is non-functional software testing?
integration level testing
click to copy
Beta testing will be done by
validation
click to copy