Quick Revision

GK One-Line Question & Answer

15541+ short questions with short answers, covering every category and sub-category on the site — no long articles to scroll through. Good for a fast recap before an exam, or a few minutes of daily practice.

Software Engineering → Spiral Model 4

A chronological record of relevant details about the execution of tests is called as, a _______
system building
click to copy
Bug status is set to postpone due to _.
black box testing
click to copy
First graphical user interface used commercially was introduced in
business plan
click to copy
Select which option is not true about SQA…?
end users
click to copy

Software Engineering → Agile Model 4

Which of the following is not other name for structural testing?
all of the above
click to copy
Which Testing is performed first?
developer’s end
click to copy
What is/are the main component / components of user interface ?
stress testing
click to copy
A product which is manufactured by using the degree of the design specification…
alpha
click to copy

Software Engineering → Requirement Engineering 4

Which things are measured by software Test effectiveness?
decreases
click to copy
Verification and Validation uses _.
testing is context dependent
click to copy
Which one is the basic input device in GUI
test closure activity
click to copy
Which of the following is not included in prevention cost?
requirement design
click to copy

Software Engineering → Software Design 4

In which of the following type of testing, testing is done without planning and documentation?
evaluating deliverable to find errors
click to copy
Testing beyond normal operational capacity is _.
during requirement analysis
click to copy
Which of the following model put much more emphasis on testing?
1, 4
click to copy
Select the people who identify the document and verifies the correctness of the software…
it may be difficult to determine if the test has passed or failed.
click to copy

Software Engineering → Coding Standards 4

When should company stop the testing of a particular software?
white box testing
click to copy
The expected results of the software is _.
business analyst
click to copy
Independent modules are easier to maintain and test because of.
moderator
click to copy
Select the option which is not an appraisal in SQA?
functional and behavioral
click to copy

Software Engineering → Software Testing 4

___________ refers to a different set of tasks ensures that the software that has been built is traceable to Customer Requirements.
run chart
click to copy
Test cases are created in which phase?
exhaustive testing is possible but impracticable
click to copy
Which of the following option is not tracked by configuration management tools?
test log
click to copy
What does Qa and QC stands for
data may be unavailable.
click to copy

Software Engineering → Debugging 4

Who performs the Acceptance Testing?
breadth test and depth test
click to copy
7n test cases are generated in which case of Boundary Value Analysis?
defect clustering
click to copy
Which of the following is not a Software Configuration Management Activity?
behavioral testing
click to copy
Which of the following is not included in External failure costs?
internal and external resources respectively.
click to copy

Software Engineering → Software Maintenance 3

Before handing over the software to the client, which testing is to be done in-house?
structural testing
click to copy
Which testing cannot be performed on first build of the software?
pesticide paradox
click to copy
The definition and use of configuration management standards is essential for quality certification in
all of the above
click to copy

Software Engineering → Introduction to Software Engineering 3

Requirement Engineering is not concern with _.
impractical but possible
click to copy
Which testing is performed with Planning and Documentation?
throughout life-cycle
click to copy
Which of the following is / are types of Software Maintenance?
ad hoc testing
click to copy

Software Engineering → Software Development Models 3

When an expected result is not specified in test case template then _.
all of the mentioned
click to copy
GUI means
all of these
click to copy
_______ is a Software Configuration Management concept that helps us to control change.
it depends on the risks for the system being tested
click to copy

Software Engineering → Waterfall Model 3

End result of Software Requirement Analysis is _.
all of the mentioned
click to copy
Plasma panel have resolution.
functional and behavioral
click to copy
What is the main aim of Software Configuration Management (SCM)?
validation
click to copy