Quick Revision

GK One-Line Question & Answer

15541+ short questions with short answers, covering every category and sub-category on the site — no long articles to scroll through. Good for a fast recap before an exam, or a few minutes of daily practice.

Software Engineering → Coding Standards 4

What are the signs that a software project is in trouble?
transition
click to copy
Which of the following is not a named phase in the System development life cycle ?
when a class has complex life cycle
click to copy
Effective risk management plan needs to address which of these issues?
both a and b
click to copy
In white box testing what do you verify?
statement 1 and 2 are correct.
click to copy

Software Engineering → Software Testing 4

Which of the following is not a phase of SDLC?
transitions
click to copy
What is the final outcome of the requirements analysis and specifications phase ?
state machine
click to copy
Risk mitigation is a risk activity. Risk monitoring is a activity
code nad fix model
click to copy
End result of Software Requirement Analysis is ________
fire fighting mode
click to copy

Software Engineering → Debugging 4

Selection of particular life cycle model is based on,
at most one initial state and one final state n
click to copy
What are the types of requirement in Quality Function Deployment(QFD) ?
system software
click to copy
Which of the following is / are the output of the Software Process?
all of these
click to copy
The inputs for developing a test plan are taken from
uncertainty and loss
click to copy

Software Engineering → Software Maintenance 4

Which of the following are incremental developmental models?
state machine
click to copy
Which of the following statements about SRS is/are true ? i. SRS is written by customer ii. SRS is written by a developer iii. SRS serves as a contract between customer and developer
all above
click to copy
As the reliability increases, failure intensity _.
end user understanding and approval
click to copy
Testing beyond normal operational capacity is __________
all of the above
click to copy

Software Engineering → Introduction to Software Engineering 4

In a college,students are asked to develop a software. Which model would be preferable
target state
click to copy
Which of the following term is best defined by the statement: “There will be a change of organizational management with different priorities.”?
improve the software process.
click to copy
White Box techniques are also classified as
quality function deployment
click to copy
Test wares are handed over to maintenance team during which phase?
all of the above.
click to copy

Software Engineering → Software Development Models 4

The first step in Software Development Life Cycle(SDLC) is
concurrent sub state
click to copy
Which of the following term is best defined by the statement: “The underlying technology on which the system is built is superseded by new technology.”?
spiral model
click to copy
E-Commerce software testing follows different approach than gaming software testing. Which testing principle implies this?
management change
click to copy
What are the criteria to decide the testing efforts?<br>1. Time and budget<br>2. Size of development team<br>3. Size of testers<br>4. Risk associated with project
avoidance, project tracking.
click to copy

Software Engineering → Waterfall Model 4

The detailed study of existing system is referred to as :
threads are nested inside another thread
click to copy
Which of the following term is best defined by the statement: “Derive traceability information to maximize information hiding in the design.”?
all of the mentioned
click to copy
When a cost to remove defect is not high?
technology change
click to copy
Who leads a formal review process?
all of the mentioned
click to copy

Software Engineering → Spiral Model 3

System analysis and design phase of Software Development Life Cycle (SDLC)
timing constraint
click to copy
Choose the correct option according to the given statements regarding risk management.<br>Statement 1: A risk is a potential problem—it might happen, it might not.<br>Statement 2: Managers, software engineers, and customers participate in risk analysis and management.<br>Statement 3: Only Managers participate in risk analysis and management.
barry boehm
click to copy
In software development life cycle , who is the best person to catch a defect?
risk monitoring
click to copy

Software Engineering → Agile Model 3

Prototyping aims at :
timing mark
click to copy
Reactive risk management is sometimes described as:
concurrent model
click to copy
Software tester focuses more on complex part of the software. Which of the following testing principle implies this?
technology risks
click to copy

Software Engineering → Requirement Engineering 3

What is a prototype ?
timing expression
click to copy
Software risk always involves two characteristics. What are those characteristics?
all
click to copy
The defect cluster change over time. Which of the following testing principle implies this?
requirements changes
click to copy

Software Engineering → Software Design 3

The phase of System Development associated with creation of the test data is
moore machine
click to copy
What is/are the different types of risk may occur when you develop software?
all
click to copy
When testing principles are useful?
minimization strategies
click to copy