Quick Revision

GK One-Line Question & Answer

15541+ short questions with short answers, covering every category and sub-category on the site — no long articles to scroll through. Good for a fast recap before an exam, or a few minutes of daily practice.

Software Project Management → Introduction to SPM 4

The                          process determines whether exposure to a chemical can increase the incidence of adverse health effect.
hazard identification
click to copy
The full form of PERT is                        
program evaluation and review technique
click to copy
Prisonner’s dilemma can be related to the following:
cooperative behaviour
click to copy
Which of the following is the future application of IoT?
role of green iot system
click to copy

Software Project Management → Project Planning 4

Which of the following data is not required for hazard identification?
estimation of risk
click to copy
The full form of CPM is                        
critical path method
click to copy
Unix sort command uses                    as its sorting technique.
quick sort
click to copy
Resource management includes
iot cloud
click to copy

Software Project Management → Project Scheduling 4

Hazard is defined as the probability of suffering harm or loss.
FALSE
click to copy
In bar charts, which colour is used to show the actual progress?
green
click to copy
Which of the following can be solved in computer science?
all of the mentioned
click to copy
What is the role of communication protocol in IoT?
mac layer issue
click to copy

Software Project Management → Risk Management 4

Why does site history have to be considered for hazard identification?
to know the probable source and causes of contamination on site
click to copy
                   are used to represent activity in a network diagram.
arrows
click to copy
Which of the following can be referred to as applications of Randomized algorithm?
all of the mentioned
click to copy
Which will reduce the energy expenditure?
clustering
click to copy

Software Project Management → Cost Estimation 4

What is the main objective of risk assessment?
to evaluate hazard and minimize the risks
click to copy
The shortest possible time in which an activity can be achieved under ideal circumstances is known as                  
optimistic time estimate
click to copy
What is the popular method of organizing wireless network topologies?
cluster
click to copy
A                  view shows the system hardware and how software components are distributed across the processors in the system.
physical
click to copy

Software Project Management → PERT and CPM 4

What is the first stage of risk assessment?
hazard identification
click to copy
According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as                      
pessimistic time estimate
click to copy
                   will enable the humans to access, control and manage the operation.
iot
click to copy
The UML was designed for describing
both object-oriented systems and architectural design
click to copy

Software Project Management → Resource Management 4

Hazard identification mainly focus on
chemical source and concentration
click to copy
The difference between the maximum time available and the actual time needed to perform an activity is known as                    
total float
click to copy
In                    the embedded devices and objects working under IoT are resource constrained.
information system
click to copy
Which of the following is an architectural conflict?
all of the mentioned
click to copy

Software Project Management → Software Metrics 4

An incident can be called hazardous only when?
stressor has the potential to cause harm to humans and ecological systems
click to copy
A randomized algorithm uses random bits as input inorder to achieve a                             good performance over all possible choice of random bits.
average case
click to copy
What type of networks is interacting under IoT?
heterogeneous only
click to copy
Which of the following is not included in Architectural design decisions?
testing the system
click to copy

Software Project Management → Quality Assurance 4

Which of the following is not a phase of project management?
project being
click to copy
Which of the following are probalistic algorithms?
all of the mentioned
click to copy
Managing of resources can be done by implementing                  
protocols and algorithms
click to copy
Which of the following pattern is the basis of interaction management in many web- based systems?
model-view-controller
click to copy

Software Project Management → Project Monitoring 4

Who introduced the bar charts?
henry gantt
click to copy
Which of the following algorithms are probably correct as well as fast?
atlantic city algorithm
click to copy
Resource management will elaborate the key aspects of                    
network management
click to copy
What describes how a set of interacting components can share data?
repository pattern
click to copy